Basic Info.
Model NO.
IF1000
Mass Scope of Workpiece
<900kg
Type
Electric Meter Test Bench
Maxcapacity
<1000KN
Accuracy Grade
0.05
Load Way
Electronic Load
Loading Method
Dynamic Load
Display
Digital
Control
Computer Control
Weight
100-500Kg
Power Source
220V/380
Oil Cylinder Position
Depends on Requirement
Transport Package
Wooden Cast
Specification
depends on client
Trademark
IFIND
Origin
Zhejiang
HS Code
9030849000
Production Capacity
50 PCS/Month
Packaging & Delivery
Package Size
70.00cm * 60.00cm * 110.00cm
Package Gross Weight
220.000kg
Product Description
The bench adopts iron sheet and aluminium-plastic alloy and it is in good shape. It consists of high voltage generator and control circuit, and it has protection doors for protection. High-voltage output can be regulated automatically or manually, which is easy to operate. Each meter position has its own test result indicator to judge whether it is puncture. This bench is suitable for the withstand voltage test of single phase meters and three phase meters
2. Key parameters
1) Accuracy: Grade 5%.
2) Power supply: 220V ±10%,50Hz/60Hz;
Maximum power consumption: 750 VA(6 positions)
Maximum output voltage: 5000V
3) Each meter position has its own test result indicator to judge whether it is puncture.
Leakage current of each meter position: 1mA-5mA;
4) The leakage current of high voltage generator can be set: 25mA, 50mA, 75mA and 100mA according to the situation.
5) High voltage output can be regulated manually or automatically.
6) Time setting: 1~99s optional; After the withstand voltage time has been reached, the high voltage generator will return to its zero position automatically.
3. Quality control
4. Operation steps of withstand voltage test for three phase energy meters( to the meter housing)
- Hang the three phase energy meters, 6 meters can be tested at the same time. And connect the wires for each meter.
- For example: 4000V withstand voltage test between the electrical coil of three phase energy meter and meter housing. Set the leakage current of each position to "5mA", and set time on the high voltage generator to "60S", then close the protection doors, waiting for the alarm lamp to flash.
- When the 4000V high voltage outputs, the voltmeter will indicate 4000V accordingly. And this process is called withstand voltage test between the electrical coil of three phase energy meter and meter housing with 4000V and 60S, the pre-set withstand voltage time has been reached, the high voltage generator will return to its zero position automatically. And the test circuit for each position has its own current relay with the pre-set value of 5mA, when the leakage current goes over 5mA, this meter is puncture, and the puncture indicator lamp of this position will light up, and the test in other positions will go on. When the test is completed, press the "RESET" button, and the indicators of positions will go out.
- If the test need to be stopped or there is something wrong during the test, just press the "RESET" button on the high voltage generator, and the high voltage will return to its zero position.
5.Packaging & Delivery
Packaging Details
electrical test bench manufacturers
Inside packing: bubble board,parts in one quality box
Outside packing: standard carton/wooden case
Customer OEM packing also available
Port
Shanghai/ Ningbo
Lead Time:
Quantity(Sets) | 1 - 1 | >1 |
Est. Time(days) | 15 | To be negotiated |
Certification
FAQ:
1.Can I get some samples?
Yes,Sample order is available for quality check and market test.
2.What's delivery time?
It usually takes about 3-5 working days for small order and 10-15 days for big order.
3.What's your payment terms?
We usually accept all kinds of payment terms.Such as T/T,L/C, Western Union.PayPal,Cash.
4.What's your warranty terms?
We offer 18 months warranty time.
5.Do you have the products in stock?
Depends on your request ,We have standard models in stock. Some special products and big order will be newly produced according to your order quantity.
6.How does your factory do the quality control?
Quality is priority ,we always attach the importance to quality control from the beginning to the end of the production.every product will be fully assembled and carefully tested before packing and shipping.
7.How to be IFIND dealer in our country ?
IFIND are looking for a reliable dealer who have professional knowledge and good contacts in local market .and we will check his annual sales. As you know.the after sale service are very important .It need professional technician to do service.Most time it not quality problem.It may be application problem.How to set the parameters according to actual application.
8.How can I trust you ??
The core of IFIND culture is honesty and loyalty.our company has been audited and approved ISO9001,CE.Assessment report will could be sent to you by e-mail .Now we have clients all around the world.
Warmly welcome to friends from home and abroad to contact us for business and cooperation .